Skip to content
Welcome to our new website! Discover our latest features and improved design. Same precision. Enhanced experience.
ARTICLE

MIM Series Part 1

2 mins

Metal injection moulding offers a unique combination of metal strength and durability with the design flexibility of injection moulding. At OptiMIM, two different types of metal injection moulding are available – standard and multi-slide. Both offer similar advantages, such as creating complex geometries, combining multiple parts, enhancing features, dramatically reducing cycle times, and obtaining greater precision and consistency. More details about each type will be shared in a future blog post. For now, let's discuss the steps in the MIM process.

Metal Injection Moulding Process

The metal injection moulding process involves four steps: compounding, moulding, debinding, and sintering. These four steps, along with feedstock, will be the focus of the next five parts of this blog series. Here is a brief overview of each process.

Feedstock/Compounding

MIM utilises metal powders combined with a plastic and wax binder, known as feedstock, as the foundation for creating parts. By mixing feedstock in-house, a wide range of metals can be offered, including NiFe, 316SS, 420SS, 17-4SS, titanium, and copper. Pre-alloyed metal powders are also available. Once mixed, the feedstock is processed through a twin-screw extruder and pelletised.

Moulding

The pellets are loaded into either a standard MIM machine or a proprietary multi-slide MIM machine. At this point, the component is called a "green part". The final part will have the same geometry as the green part but will be about 20% smaller. 

Debinding

In this step, some of the binder from the feedstock is removed. Heat, chemicals, or a combination of both are used to remove the binders and prepare the part for sintering. Once the binder is removed, the part is referred to as a "brown part".

Sintering

The brown part is placed into a continuous or batch vacuum furnace and subjected to temperatures near the material's melting point. This removes the remaining binder and densifies the part, resulting in the 20% shrinkage mentioned earlier. Sintering takes approximately 15-20 hours.

Part Two of this series will focus exclusively on the feedstock aspect of the MIM process. To answer any questions or for further discussion, contact our engineering team today!

Other articles in the series:

Related Resources
MIM Series Part 1
Start your journey into MIM with an overview of powder metallurgy basics, material selection, and the critical phases of the MIM process flow.
Read the Article
MIM Design Guide
Tired of design constraints with traditional metalworking? Explore the possibilities of MIM. Download the free guide and discover how to achieve complex designs with metals like stainless steel and titanium.
View Whitepaper
How Large Can You Create a MIM Component?
Explore the dimensional possibilities and material constraints when designing oversized components for production with metal injection moulding.
Read the Article

Interested in starting your MIM journey?

Our engineers are here to answer your questions and show you how innovative investment casting technologies can revolutionise your next project and beyond.

Contact Us